Construction at our Five Farms campus is going through exciting changes as we get closer to the end of 2021!
The construction crew has begun installing concrete slabs in the basement area for the clubhouse addition. They have opened up the wall between the Tap Room (future Trophy Bar) and the Main Grill Dining area and have laid brick for the opening between the two rooms. For the Trophy Bar area, they have completed the core drilling to make it easier for the installation of the new plumbing. The construction crew has also framed the future fireplaces, which will be in Main Grill Dining and the Outdoor Patio. Additionally, they have continued installing the new sewer and storm lines and have begun demolition for the foundation of the walls enclosing the new loading dock.