Exciting changes are happening at the Five Farms construction site!
The construction crew has placed and smoothed the concrete for the Foyer and Golfers’ Entry. Temporary heat coming from the enclosed basement addition will help with curing the concrete in winter temperatures. They have also continued to build the masonry walls for the loading dock. The construction crew placed the chimney foundation and commenced masonry in the Main Grille Dining area. They have built the parapet wall framing and exterior sheathing for the fencing above the East Terrace. The kitchen walls have one side sheetrock for stability and the walls leading to both locker rooms have been replastered,