The progress has continued at the Five Farms construction site!
The construction crew has enclosed the East Terrace Room, so it is now part of the interior of the building. The chimney installation has begun in the Main Grille Dining and Outdoor Patio areas. The construction crew continued ductwork installation throughout the clubhouse and the wall erection at the loading dock. In addition, they have placed and smoothed the concrete for the upper-level terraces and begun the wall layout in the basement addition. Finally, the dishwashing station in the kitchen has seen rough-in plumbing for future water supply lines.