Exciting updates are happening throughout the Five Farms clubhouse!
The construction crew has completed a lot of work in the Elm Room, including installing recessed lighting, building the wood framing for the ceilings, and applying drywall on the fireplace. Other interior clubhouse updates include installing electric lines, ceiling framing, ductwork, and bulkheads throughout the clubhouse. In addition, they have torn up the current walkway pavers, which will be replaced with nicer ones. The crew has completed installing the roof trusses and ensured the structure before an inspection. Finally, they have worked on the ceiling framing for the Adirondack Bar and the roofing for the unoccupied terraces.